Latest Posts Page 818
Expansion of Zhengzhou Xinzheng International Airport: Phase II T2 Terminal Project
The T2 terminal project at Xinzheng International Airport, managed by the China Machinery Industry Sixth Institute, cove...

The Lucky Grass: A Winning Tale of Decorative Elegance
Win Win Lucky Grass Composes Decoration Legend — Construction Record of China Construction Eighth Engineering Division D...

Using BIM Technology for Surface Design in the 290 Mulberry Street Project
Abstract: This article presents the application of BIM technology in the exterior design of the 290 Mulberry Street proj...

How China Railway Long's BIM Technology Enhances the Design of Xi'an Metro Line 5
Since its establishment, the Design Project Department of China Railway Long Design and Research Institute has been resp...
How BIM Technology Enhances Shanghai Metro Line 12 Construction
1. Project Background Project Name: Qufu Road Station Project, Shanghai Metro Line 12 Design Unit: Shanghai Underground ...

The Impact of BIM Technology on Guangzhou Metro Network Operation Management Center
BIM technology has become a hot topic in the construction industry in recent years. However, many industry insiders beli...
Exploring BIM Applications Across the Entire Project Life Cycle
Research and Practice of BIM Application Throughout the Whole Life Cycle — The Second Edition of 2013 “Dragon Cup&...

Yang Wei, Chief Engineer of Dongta Project: Implementing a BIM-Based General Contracting Project Management System
How can construction companies leverage BIM technology to pursue sustainable development in the context of modern societ...
Applying AI-Enhanced BIM Technology in Tunnel Engineering
The Application of BIM Technology in Tunnel Engineering — The second edition of 2013 “Dragon Cup” — Exhibition of Award-...
Integrating Human Factors, Green Building, and BIM: A Top-Down Design Approach
A Brief Analysis of the Integration of Human-Machine Engineering, Green Building, and BIM under the TOP-DOWN Design Conc...

Implementing BIM in the Renovation and Expansion of China State Construction Corporation’s Experimental Building
China Construction Second Engineering Bureau Third Construction Engineering Co., Ltd. (formerly known as China Construct...

BIM Implementation in the Mechanical and Electrical Systems of Wangfujing Hotel Renovation
1. Project Introduction Wangfujing Hotel, established in 1986, is located in the bustling business district of Wangfujin...

How BIM Streamlined Steel Structure Pre-Assembly for the National Convention and Exhibition Center in Shanghai
On June 30th, the Ministry of Commerce and the Shanghai Municipal People’s Government jointly completed the world&...

Implementing BIM in the Tianjin Yongli Building Project
1. Project Overview The project is situated at the intersection of Yujiang Road and Wudi Road in Hexi District, Tianjin....

Exploring the Advanced Use of BIM Technology in the Zhaoqing Yuejiang Bridge Project
To enhance the management quality of bridge construction, the Road and Bridge Group has pioneered the pilot implementati...

Inside the Challenges of Building the Chow Tai Fook Financial Center, One of the Tallest Skyscrapers
Yesterday, a reporter learned from the Tianjin Chow Tai Fook Financial Center project, managed by China Construction Eig...

Exploring BIM-Based Operation and Maintenance in SOHO Property Management Systems
“The application of IoT technology, centered on BIM, not only enables three-dimensional visualization of building inform...
How BIM is Shaping a New Generation of Commercial Complexes in Wuhan
Recently, Beijing Internet Cube Technology Service Co., Ltd. (isBIM) and Wuhan Oceanwide City Plaza Development and Inve...
Luban BIM Earns Recognition from Property Owners at Chongqing Convention and Exhibition Center
Recently, Chongqing Yifan Engineering Cost Consulting Co., Ltd. signed a contract with Luban Software to provide BIM pro...
Engineering Project Spotlight: Sports Center at Congo Brazzaville Stadium
Building Overview: The total construction area of the sports stadium is 79,533 m², distributed as follows: First floor: ...







