Building Overview: The total construction area of the sports stadium is 79,533 m², distributed as follows:
- First floor: 28,070 m²
- Second floor: 9,874 m²
- Third floor: 3,224 m²
- Fourth floor: 8,528 m²
- Fifth floor: 8,698 m²
- Sixth floor: 190 m²
- Grandstand layer under the canopy: 20,958 m²
Laifuluo 2014 Mechanical and Electrical BIM Construction Drawing Output
The comprehensive 3D model allows for direct output of various professional diagrams.
Reserved hole diagrams and Excel lists for casing can be generated.
Within the main structure, sleeves or openings can automatically be added based on piping properties. The sleeve dimensions correspond to the insulation thickness and nominal diameter of the pipes. Additionally, numbering and casing lists can be exported to Excel.
Laifuluo Construction Drawing Output
Construction drawing output – floor plans
Construction drawing output – cross-sectional views
About Beijing East Intercontinental Technology Consulting Co., Ltd
Founded in Beijing in 2001, Beijing East Intercontinental Technology Consulting Co., Ltd. is a building equipment design consulting firm with over a decade of experience. Starting with building equipment design, the company expanded its services to include design supervision, consulting, energy-saving diagnostics, and enterprise product agency. In 2011, Dongzhou Group was established in Hong Kong to oversee operations in Beijing and Tokyo branches.















Must log in before commenting!
Sign Up