1. Project Overview

The project is situated at the intersection of Qinglongshan Street and Butterfly Spring Road in Bayuquan. It covers an area of 53,300 square meters with a total building area of 97,000 square meters. The structure includes one underground floor and three above-ground floors, with some sections extending up to five floors, reaching a height of 26.7 meters.
This development is a comprehensive commercial complex that integrates shopping, dining, and entertainment facilities.
2. Overview of BIM Technology Application in the Project

3. BIM Technology Implementation Plan

4. BIM Technology Application System in the Project
BIM for Construction Site Layout Management
The construction site is limited in space, so BIM technology was employed for efficient site layout planning. A standardized temporary construction facility library was created, and a 3D virtual walkthrough was used to demonstrate the feasibility of various plans. Ultimately, the most effective layout was selected based on these simulations.


BIM for Schedule Control

BIM in Technical Quality Management

Drawing Review

Information Technology Inspection

Sample Introduction
The project replaces physical templates with virtual ones, eliminating the need for on-site template production. This approach reduces costs, guides construction effectively, and supports green building practices.





Construction Process Transparency


3D Laser Scanning Technology


BIM for Comprehensive Pipeline Layout




Guidelines for Quality Control Standards and APP Mobile Device Practices


BIM Application in Fire Pump Room