Wuhu LNG Emergency Peak Shaving Gas Supply Project

Abstract
To address the winter peak gas supply shortage and mitigate fluctuations caused by seasonal gas demand, Wuhu Zhongran Urban Gas Development Co., Ltd. has initiated the LNG Emergency Peak Shaving Gas Source Project. This project is based at the North Gate Gasification Station located in the suburbs of Wuhu, with an additional 14.5 acres of newly acquired land.

1. Project Background

1. Project Name: Wuhu LNG Emergency Peak Shaving Gas Source Project

2. Project Design Unit: China Municipal Engineering North China Design and Research Institute

3. Software Used: Graphisoft MEP Modeler

2. Main Text

China Municipal Engineering North China Design and Research Institute

Wuhu LNG Emergency Peak Shaving Gas Source Project

Wuhu LNG Emergency Peak Shaving Gas Source Project

Aerial rendering of the project

Owner: Wuhu Zhongran Urban Gas Development Co., Ltd.

Project Scale: LNG gasification station with a 4500m3 storage tank and gas supply capacity of 30,000 Nm3/h.

Location: Expansion based on the North Gate Gasification Station in Wuhu suburbs, with an additional 14.5 acres of land acquired.

Project Objective: To bridge the gap in winter peak gas supply and smooth out the supply-demand fluctuations caused by seasonal peaks and troughs.

Project Status: Completed

Wuhu LNG Emergency Peak Shaving Gas Source Project

Comparison of project achievements

Wuhu LNG Emergency Peak Shaving Gas Source Project

Wuhu LNG Emergency Peak Shaving Gas Source Project

MEP Model

Wuhu LNG Emergency Peak Shaving Gas Source Project

Documents are automatically generated based on BIM models.

The list exported from ArchiCAD to Excel can be filtered and processed using required functions with ease.

Design Phase:

Design reviews are conducted on a shared server to improve collaboration and efficiency. This approach reduces the cost of rendering by utilizing the created models for in-house processing.

Given the tight schedule and heavy workload, models are created to detect clashes promptly. Early coordination and resolution of conflicts prior to construction minimize modifications, reducing both material waste and time delays.

Construction Phase:

Accurate material lists are generated quickly, enhancing the ability to summarize and analyze costs efficiently. This enables precise project cost estimation and effective cost control.

*Project developed with Graphisoft software

xuebim
Follow the latest BIM developments in the architecture industry, explore innovative building technologies, and discover cutting-edge industry insights.
← Scan with WeChat
Like(0) 打赏
BIM WORLD » Wuhu LNG Emergency Peak Shaving Gas Supply Project

Comment Get first!

Must log in before commenting!

 

BIM World, A Professional BIM Learning Platform

Stay updated on the latest architecture trends and share new building technologies.

Contact UsAbout Us

觉得文章有用就打赏一下小编吧

非常感谢你的打赏,我们将继续提供更多优质内容,让我们一起创建更加美好的网络世界!

支付宝扫一扫

微信扫一扫

Account Login

By signing in, you agree toUser Agreement

Sign Up