BIM World
A Professional BIM Learning Platform


BIM in Revit: How to Manage Different Absolute Elevations for Multiple Buildings When Modeling Separately and Linking

First, display and adjust the Absolute Elevation. For example, a level 0.000 relative to an absolute elevation of 45.000 is commonly used data in Beijing.


BIM technique - Revit modeling, where the absolute elevation of ± 0.000 for multiple individual buildings is different (there are multiple buildings on the site), what should be done when modeling separately and then linking them?

Next, two methods can be used to share the coordinate system: “Acquire Coordinates” and “Publish Coordinates”. Both methods are quite similar:

  • Acquire Coordinates: Open the individual model, link the overall model, adjust the overall model to the correct location, then click to acquire coordinates. This method obtains the correct position of the individual model within the overall plan.
  • Publish Coordinates: Open the overall plan, link the individual model, adjust the position of the individual model, then publish coordinates and save. This publishes the correct location from the overall plan to the individual model.

Based on your scenario, we recommend using the Publish Coordinates method as described in 2.2.

To begin, open the overall layout model and import the individual units using the Center to Center option.


BIM technique - Revit modeling, where the absolute elevation of ± 0.000 for multiple individual buildings is different (there are multiple buildings on the site), what should be done when modeling separately and then linking them?

Then, find the correct position along the X, Y, and Z axes.


BIM technique - Revit modeling, where the absolute elevation of ± 0.000 for multiple individual buildings is different (there are multiple buildings on the site), what should be done when modeling separately and then linking them?

After that, publish the defined coordinates and save the model.


BIM technique - Revit modeling, where the absolute elevation of ± 0.000 for multiple individual buildings is different (there are multiple buildings on the site), what should be done when modeling separately and then linking them?

You can apply the same method to the other individual buildings to complete the task successfully.


BIM Technique – Revit modeling where the absolute elevation of ± 0.000 differs among multiple individual buildings on the same site: how to model separately and then link them?

xuebim
Follow the latest BIM developments in the architecture industry, explore innovative building technologies, and discover cutting-edge industry insights.
← Scan with WeChat
Like(0) 打赏
BIM WORLD » BIM in Revit: How to Manage Different Absolute Elevations for Multiple Buildings When Modeling Separately and Linking

Comment Get first!

Must log in before commenting!

 

BIM World, A Professional BIM Learning Platform

Stay updated on the latest architecture trends and share new building technologies.

Contact UsAbout Us

觉得文章有用就打赏一下小编吧

非常感谢你的打赏,我们将继续提供更多优质内容,让我们一起创建更加美好的网络世界!

支付宝扫一扫

微信扫一扫

Account Login

By signing in, you agree toUser Agreement

Sign Up