Prefabricated Building: A Complete Guide to Production, Construction, and Approval

1. Project Overview

1.1 Introduction to Engineering Construction

1.2 Geographical Location and Project Summary

2. Compilation Basis

Production of Prefabricated Components

2.1 Production Process

2.2 Technical Standards and Production Methods

2.3 Production Plan

2.4 Production and Quality Control of Prefabricated Assembled Components

1. Component production and manufacturing details

2. Step-by-step production process

3. Mold making and installation procedures

4. Steel reinforcement skeleton fabrication, shaping, and molding

5. Installation of metal components

6. Concrete preparation

7. Lifting, demolding, and labeling of components

8. Acceptance criteria for finished components

9. Product inspection and repair of defects (construction industrialization)

10. Safety and technical measures

Construction Hoisting System

3.1 Construction Preparation

3.2 Construction Methods

1. Section division

2. Reserved steel bars for cast-in-place roof columns

3. Production of steel bar positioning sleeve plates

4. Plate positioning and fixation techniques

5. Cleaning procedures for cast-in-place layers

6. Layout planning for hoisting operations

7. Lifting of prefabricated components

8. Staircase hoisting methods

3.3 Supporting System

1. Fixation of prefabricated column slant supports

2. Beam-column node formwork

3. Transportation and vertical handling of supporting system materials

3.4 Concrete Pouring, Support Reservation, and Pre-embedding

3.5 Sleeve Connection Grouting

3.6 Safe Construction

1. Safety protection measures for edge work

2. Safety management during lifting operations

3.7 Quality Control

1. Factory acceptance of prefabricated components

2. Prefabricated Component Forming Acceptance Form

3. Precision control and verification during component installation

3.8 Finished Product Protection

NALC Board Construction System

4.1 Material Stacking

4.2 Material Organization and Mobilization Plan

4.3 Sheet Metal Lifting Work

4.4 Construction Organization

4.5 Preparation of Construction Tools

4.6 Labor Organization

4.7 Safety Management

4.8 Quality Management of NALC Board Installation

4.9 Finished Product Protection

4.10 Quality Records

xuebim
Follow the latest BIM developments in the architecture industry, explore innovative building technologies, and discover cutting-edge industry insights.
← Scan with WeChat
Like(0) 打赏
BIM WORLD » Prefabricated Building: A Complete Guide to Production, Construction, and Approval

Comment Get first!

Must log in before commenting!

 

BIM World, A Professional BIM Learning Platform

Stay updated on the latest architecture trends and share new building technologies.

Contact UsAbout Us

觉得文章有用就打赏一下小编吧

非常感谢你的打赏,我们将继续提供更多优质内容,让我们一起创建更加美好的网络世界!

支付宝扫一扫

微信扫一扫

Account Login

By signing in, you agree toUser Agreement

Sign Up