The beauty lies in the details,
which often evoke
▼
powerful emotions.
Details
reflect elegance and refinement,
revealing the path to showcasing human aesthetics.
Today, we invite you on a tour
through exquisite electromechanical engineering.
1. Refrigeration and Air Conditioning Equipment
The equipment, pipelines, valves, and accessories in the refrigeration and air conditioning heat exchange rooms are neatly arranged, reliably grounded, and logically laid out. Clear markings and complete nameplates enhance functionality, while the brackets are safe, visually appealing, and impressive.


The refrigeration room layout is practical, ensuring reliable equipment operation. The brackets provide safety and solidity while maintaining an elegant appearance.

The air conditioning water pumps are installed smoothly, with effective shock absorption and reliable grounding. The aluminum skin provides protection and adds to the aesthetic appeal.

The air conditioning heat exchange room features a well-organized layout, reliable equipment operation, and secure, elegant brackets. Clear labeling ensures easy identification.
2. Domestic Water Pumps and Fire Pump Room
The installation of domestic water pumps and fire pump room equipment is solid. Stainless steel pipes are isolated from carbon steel pipes, valve heights are uniform, and the pipeline layout is both functional and visually appealing.

The domestic water pump room is beautifully arranged, featuring protective aluminum skin, neatly aligned pipes, and clear markings suitable for prefabricated houses.
The fire pump room layout is equally impressive, with consistent valve heights, evenly applied paint, orderly pipe arrangements, and clear markings.
Valve heights in the fire pump room are uniform, paint finishes are smooth, and pipes are organized in neat rows.
Fire pump equipment installation is solid, with individually stressed valves, consistent valve heights, uniform paint application, and orderly pipe layouts.
The grounding of the distribution cabinet in the fire pump room is reliable. Inside the cabinet, cables are neatly arranged, bottom insulation boards are properly insulated, and fireproof sealing is well executed.
Reliable grounding of fire pump equipment.

3. Distribution Room
The distribution cabinets are installed and arranged with precision. They stand vertically and firmly, while cables in the cable trench are neatly laid out with clear identification. Grounding is reliable, ensuring smooth system operation.
Distribution cabinets exhibit a consistent installation height and are aligned in orderly rows.
The cables in vertical trays are well-organized, with clear markings and effective fireproof sealing.
4. Garage Pipeline Layout
The garage pipelines are beautifully arranged. Joint supports and hangers provide safety and reliability, pipelines are properly sleeved, and light strip trunking is straight. Spray layout spacing is consistent, with clear labeling.
The garage pipeline layout is neat, with reliable supports and straight light strip trunking.
Clear labeling further enhances the organized appearance of the garage pipelines.
5. Distribution Well and Electric Cabinets
Cable connections in each distribution well cabinet are secure, with clear circuit markings. Cable inlets and outlets are tightly sealed and visually tidy.
Inside the electric well, distribution cabinets are firmly installed, reliably grounded, and clearly labeled.
The weak current well maintains a clean and tidy layout.
Cables inside distribution boxes are orderly, with clear circuit markings and reliable grounding.

Brackets inside pipeline wells are securely fixed, pipeline layouts are logical, markings clear, and wall and floor penetrations are tightly sealed.
6. Bathroom Sanitary Ware Installation
Sanitary fixtures are accurately positioned with equal spacing and consistent height. Floor drains are centered for optimal drainage.
Precise installation ensures equal spacing and uniform height.
Floor drains are centered within Anju ceramic tiles.
7. Roof Equipment Pipelines
The roof equipment pipelines are laid out sensibly, maintaining a clean and fresh appearance. Ventilation pipes are grounded reliably, the appearance is polished, and drainage outlets are centered.
The roof pipeline layout is both practical and neat.
Drainage outlets are perfectly centered.
8. Ceiling Fixtures
Ceiling lighting fixtures, nozzles, air vents, and smoke detectors are arranged with exquisite precision. They are aligned horizontally, vertically, and diagonally in a harmonious, staggered pattern that complements the interior design.
In the consultation room’s waiting area, lighting fixtures, nozzles, air vents, and smoke detectors are arranged meticulously with horizontal, vertical, and diagonal rows in a staggered layout.
Ward corridor

Outpatient Hall
9. Pipeline Wall Penetration
At pipeline wall penetration points, sleeves are centered and sealed tightly with fireproof mud. Brackets are securely fixed, and paint is applied evenly.

The pipeline sleeve at wall penetration points is centered, with fireproof mud sealing tightly in place.














Must log in before commenting!
Sign Up