![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205222.jpg)
The 3D GIS demonstration scripting feature has been effectively applied in multiple emergency command plan development processes. Companies like Aibo Jiesi and Tianhe Cloud Construction have conducted in-depth research on its capabilities. Notably, this scripting function also proves highly effective in creating fire protection plans. Today, we will explore its application.
Phase One
Locate the Building
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205224.jpg)
The building’s internal structure is displayed using transparency for detailed inspection.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205228.jpg)
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205235.jpg)
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205235-1.jpg)
An unexpected fire breaks out inside the building.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205235-2.jpg)
Analyzing the layout of shops on the building’s first floor.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205300.jpg)
Display of indoor fire hydrant locations throughout the building.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205302-1.jpg)
On-site firefighting efforts by building personnel commence.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205302-3.jpg)
Due to the severity of the fire, authorities are notified.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205302-4.jpg)
Display of all safety exit locations within the building.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205302-7.jpg)
Personnel are notified and guided to evacuate the building in an orderly manner.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205303-1.jpg)
Phase Two
The fire control center receives the alarm call and begins analyzing the situation.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205303-2.jpg)
Nearby emergency teams are located.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205303-4.jpg)
A team is selected, and the optimal route to the fire scene is analyzed.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205304-3.jpg)
Fire scene information is extracted and analyzed for effective response planning.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205305-1.jpg)
The fire control center remains on alert and ready to coordinate.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205305-2.jpg)
Upon arrival at the fire scene, the distribution of outdoor water sources is displayed.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205305-4.jpg)
Analysis of the fire hose deployment methods is conducted.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205305-5.jpg)
Firefighters carry out firefighting operations on site.
![Prefabricated | [BIM Application] BIM+VR-GIS Combined Demonstration: Fire Protection Plan](https://en.bimii.com/wp-content/uploads/2018/08/1535205306-1.jpg)
Prefabricated research and development
The firefighting operation is successfully completed.