Download the Nanjing BIM Technology Service Fee Pricing Guide for Design and Construction Stages

Reference for Pricing of Building Information Modeling (BIM) Technology Application Service Fees in Nanjing City (Design and Construction Stages)

1. Scope of Application
This pricing reference applies to BIM technology application service fees for the design, construction, and management of new housing construction projects and municipal infrastructure projects in Nanjing. It can also serve as a guideline for renovation, expansion projects, and other types of projects.

2. Application Requirements
The BIM application stage, content, model detail level, and deliverables must comply with relevant national, Jiangsu Province, and Nanjing City BIM specifications, standards, and technical guidelines. They should also meet the BIM construction drawing review, completion acceptance management, and other requirements within the Nanjing Engineering Construction Project BIM Intelligent Review System.

3. Pricing Explanation

  1. BIM application service fees are calculated as: Pricing basis × Unit price (or rate) × Engineering complexity adjustment factor.
  2. For housing construction projects, pricing is based on building area, while municipal engineering projects use the construction contract price as the basis.
    – If a building’s construction area is less than 10,000 m², pricing will be based on 10,000 m².
    – For large-scale bridge and comprehensive transportation hub projects, if the construction contract price is under 100 million yuan, pricing will be based on 100 million yuan.
    – For other municipal projects, if the contract price is less than 30 million yuan, pricing will be based on 30 million yuan.
  3. Tables 1 and 2 provide the base price lists for design and construction stages. When services cover both stages simultaneously, the total fee is calculated at 90% of the sum of the individual stage fees.
    The BIM application fee during the construction phase covers ongoing services based on deliverables required from the design phase. If BIM application was not performed or requirements were unmet during design, additional fees shall be negotiated.
  4. For project types listed in Table 3, the engineering complexity adjustment factor may be applied accordingly.
  5. This pricing reference only includes mandatory deliverables listed in Table 4. Fees for other deliverables should be negotiated.
    The pricing includes the cost of the service provider’s BIM software and collaborative management platform, as well as technical support during design and construction phases for BIM review and acceptance reporting in the Nanjing BIM Intelligent Review System.
    It excludes costs related to BIM technology research and development.
  6. These prices are for reference only. Final costs are subject to negotiation based on workload and deliverable requirements.
    Note: New BIM pricing standards in China and Jiangsu Province may also apply.

4. Appendix

Table 1: Basic Price List for Housing Construction Engineering Costs

Pricing Serial Number Application Stage Pricing Basis Unit Price (yuan/m²)
Single Project Application Individual Civil Engineering Applications Standalone Electromechanical Installation Interior Decoration & Renovation
A B C D
1-1 Design Phase Floor Area 18 6 9 7
1-2 Construction Phase 16 6 9 4

Notes:

  • “Single project application” refers to comprehensive application across all relevant disciplines at the given stage, including architecture, structure, plumbing, electrical, HVAC, fire protection, civil defense, and decoration.
  • The design phase covers concept design, preliminary design, and construction drawing design (including revisions).
  • For interior decoration and renovation projects, the building area refers only to the decorated portion.
  • Outdoor engineering site modeling (such as sponge city, pipeline networks, civil engineering) can be priced at 2–3 yuan/m² based on site area.

Table 2: Basic Price List for Municipal Engineering Costs

Pricing Number Application Stage Pricing Basis Pricing Rate (%)
Single Project Application Roadbed & Pavement Engineering Bridge & Culvert Engineering Tunnel Engineering Municipal Pipelines or M&E Installation Other Municipal Applications
A B C D E F
2-1 Design Phase Construction Contract Price 0.19% 0.10% 0.26% 0.21% 0.48% 0.21%
2-2 Construction Phase 0.16% 0.08% 0.22% 0.18% 0.40% 0.18%

Notes:

  1. The pricing basis is the construction contract price and applies to BIM technology usage across all disciplines or selected specialties within a project.
  2. Single project application covers the entire professional scope; for partial specialties, pricing should be based on the cost of those applied specialties.
  3. Projects not listed may be priced according to other municipal engineering categories.

Table 3: Engineering Complexity Adjustment Factors

Serial Number Engineering Type Adjustment Factor
Building Construction Projects
1 High star green buildings or prefabricated buildings 1.1–1.3
2 Government-funded housing (affordable, resettlement, talent apartments) with construction area over 200,000 m² (partial) 0.5–0.8
3 Airport terminals, high-speed railway stations, large cultural/sports venues, commercial complexes, comprehensive hospitals, data centers, historic buildings, complex steel or composite structures, super high-rise buildings 1.2–1.8
Municipal Engineering
1 Comprehensive transportation hubs, large interchanges, steel or composite bridges, bridges with complex stress types (suspension, cable-stayed, arch), and complex-shaped landscape bridges 1.2–1.6
2 Short tunnels (≤ 500 meters) 0.8–0.9

Notes:

  • For projects matching multiple categories, multiply the applicable adjustment factors.
  • BIM service costs vary due to differences in engineering complexity, scale, and material/equipment standards.

Table 4: Deliverables by Phase

Phase Deliverables
Construction Drawing Design Stage
  1. Complete professional construction drawing models and NJM format models (including architecture, structure, electromechanical, outdoor water supply and drainage, etc.)
  2. 2D construction drawings
  3. Comprehensive clash detection reports and optimization plans
  4. Pipeline analysis and optimization plans (including indoor net height)
  5. Quantity takeoff based on BIM models
  6. 3D virtual walkthroughs and video animations
Construction and Completion Acceptance Stage
  1. BIM implementation plans, construction simulation animations, site layout models and controls
  2. Detailed design models and drawings for special projects
  3. BIM management materials (including bill of quantities, net height control, physical model comparisons, etc.)
  4. Model updates due to engineering changes
  5. Completion information model (including NJM format)

Notes:

  • The delivered BIM model should be an editable source model containing engineering information from the current and previous stages.
  • Engineering drawings are exports from the model and must be consistent with it.
  • Construction drawing models (NJM) must comply with standards such as the “Technical Guidelines for BIM Design and Delivery of Construction Drawings in Nanjing,” and receive qualification notices for intelligent BIM review.
    Completion information models (NJM) must meet the “Technical Guidelines for Delivery of Completion Information Models for Construction Projects in Nanjing.”
资源下载此资源仅限注册用户下载,请先
技术支持,放心下载!

Comment Get first!

Must log in before commenting!

 

BIM World, A Professional BIM Learning Platform

Stay updated on the latest architecture trends and share new building technologies.

Contact UsAbout Us

觉得文章有用就打赏一下小编吧

非常感谢你的打赏,我们将继续提供更多优质内容,让我们一起创建更加美好的网络世界!

支付宝扫一扫

微信扫一扫

Account Login

By signing in, you agree toUser Agreement

Sign Up